Phase 6 Review — Productization (in-environment scope)¶
Historical review recorded before the 2026-07-29 post-review improvements. TED is now verified live, the dashboard has filters/detail views, and GitHub Pages automation is prepared. The statements below remain the evidence that was true at the original review time.
Date: 2026-07-28 · Four-review standard applied to the productization work.
1. Engineering review¶
Executed and green: ruff clean, mypy strict clean (36 source files),
192 tests passed, mkdocs build --strict green with the expanded nav.
Actually generated (not just written about): the weekly report
(reports/weekly_report_*.md), the data dictionary from live schema
introspection (35 warehouse objects), and the committed sample exports
(XLSX + 11 CSVs + manifest) in data/samples/.
Findings:
- The weekly report is byte-reproducible by construction and by test: its
as-of date is the latest stored run timestamp — no wall-clock values exist
in the output (generate twice → identical is a test).
- The data dictionary is generated by scripts/gen_data_dictionary.py from
PRAGMA introspection of a freshly built warehouse — documentation that
cannot drift from the schema.
- Deployment recipes are explicitly labelled NOT-executed-here with their
verification steps (docker daemon and package index unavailable).
2. Data review¶
- Sample exports and the sample report are pipeline outputs over committed fixtures — regenerable with three commands (data/samples/README.md), each carrying provenance (README sheet / manifest / demo banner).
- The report's tender radar computes "upcoming" against the stored as-of date, keeping the document deterministic; expired deadlines are counted, not hidden.
3. Business review¶
- The brief's portfolio deliverables now exist and cross-reference: case study (10 required points), analysis report (findings each with a lineage path and observation-vs-inference label), Upwork assets (title, ~850-char description, three packages mapped to repo proof points, pilot structure, proposal snippets, client-problem list — and no prices, per brief rule).
- Missing from the brief's demo-asset list and honestly not fake-able here: dashboard screenshots and an OpenAPI link (no dashboard/API can run in this environment) and the portfolio video script's screen-capture targets beyond CLI output. Tracked in backlog P3 as environment-blocked.
4. Honesty review¶
- The analysis report leads with a demo-data notice and still keeps the brief's full section discipline (coverage, alternative explanations, limitations) — the template proves itself without fabricating findings. ✅
- Security pass: no secret patterns in the repo;
.envgit-ignored; the only full-profile secret is the local Postgres password via.env. ✅ - Deployment claims: none — every recipe states it has not been executed here and what its verification step is. ✅
- Weekly report over demo data cannot be mistaken for market reporting (banner + per-section "demo values" labels). ✅
Gate decision: Phase 6 passes for its in-environment scope. The project is now handover-ready: remaining items (first CI run, dashboard/API, live source integration C-03, DuckDB/Postgres restoration, curated company seed) all require a network-enabled environment and are listed in the backlog with their conditions.